What necessary investigations should be made before screening corrosion and scale inhibitors
As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:
(1) Water quality
(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.
(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '
(3) water quality of circulating cooling
If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-
(2) Design data of circulating cooling water system
Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,
The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.
(3) Data and process characteristics of the water cooler
Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.
(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.
| 五月丁香国产精品| 亚洲精品久久久酒店| 久久久日韩AV无码| 视频在线天堂在线| 无码婷婷在线观看| 手机在线看成人网站| 美女裸无遮挡网站| 卡通动漫无码在线观看视频| 亚洲欧美在线电影| 精品国产伊人久久| 午夜剧场在线香蕉| 中文字幕91在线| 欧美一区成人日韩| 亚洲AV人人看人人爽人人| 国产女同av在线| 九九九久久精品亚洲视频久久精品| 97人人爽人人射| 亚洲婷婷在线播放| 日日免费不卡av| 国产v亚洲v天堂无码| 插插五月婷婷激情| 久草视频国产5| 无码中文字幕蜜臀免费| 91福利视频网站| 日韩无码成人片丁香亚洲激情五月 | 明星精品在线云播| 久久久久久久er| 中文字幕亚洲影音| 午夜老司机看午夜| 鲁一鲁噜噜成人网| 伊在国产在线视频| 九九九一区二区三区| 午夜无码资源| 久久视频中文字幕| 黄片特黄无码水多一级片| 另类综合视频一区二区| 农村班花免费毛片| 成人熟女视频网站| 久久久久久免费国产| 91大学视频在线|