Reverse osmosis membrane chemical cleaning process



The frequency of membrane cleaning is closely related to the perfection of the pretreatment measures. The more perfect the pretreatment, the longer the cleaning interval; On the contrary, the simpler the pretreatment, the higher the cleaning frequency. The specific cleaning process is as follows:


Reverse osmosis membranes are used for low pressure flushing at 4Bar(60psi) or lower pressure conditions, where clean water is pumped from a cleaning tank (or suitable water source) into the pressure vessel and discharged for a few minutes. Rinse water must be clean, RO product water or deionized water that has been removed from hardness and is free of transition metals (Fe, Mn, etc.) and residual chlorine.




(2) the reverse osmosis membrane prepares the specified cleaning solution in the cleaning tank. The water used for preparation must be RO product water or deionized water that has been removed from hardness and is free of transition metals and residual chlorine. The temperature and pH of the cleaning solution should be adjusted to the required values.




(3) Start the cleaning pump and pump the cleaning liquid into the membrane module, and cycle the cleaning for about 1 hour or the required time. During the initial phase, the initial backflow should be drained before the cleaning solution is returned to the RO cleaning tank to avoid dilution of the cleaning solution by residual water in the system. After the chemical agent comes into contact with the RO device, the pollutants in the device will be flushed out in large quantities under the action of chemical reaction. In order to avoid contaminating the cleaning liquid, the cleaning liquid should also be discharged until the color of the cleaning liquid turns pale and then enter the cycle for cleaning. For the first 5 minutes of the cycle, slowly adjust the flow rate to 1/3 of the maximum flow rate. In the second 5 minutes, increase the flow rate to 2/3 of the maximum design flow rate, and finally increase the flow rate to the maximum wash flow rate. If necessary, readd the drug to adjust the pH when the pH change is greater than 0.5.




(4) Cyclic cleaning and soaking procedures can be used alternately according to needs. Reverse osmosis membrane immersion time can be selected from 1 to 8 hours according to the manufacturer's recommendations. Be careful to maintain the proper temperature and pH throughout the cleaning process.




(5) After chemical cleaning, clean water (RO product water or deionized water that removes hardness and does not contain metal ions such as iron and chlorine) shall be used for low-pressure flushing, and the residual chemical agents shall be flushed from the cleaning device and relevant pipelines, and the cleaning tank shall be discharged and flushed, and then the cleaning tank shall be completely filled with clean water. Pump all rinse water from the wash tank to flush the pressure vessel and drain. Until the chemical residues in the RO device are basically removed.




(6) After the reverse osmosis membrane is completely rinsed with clean water, the final low pressure rinsing can be carried out with pretreated water. The feedwater pressure shall be less than 4bar and the final flush shall be continued until the rinse water is clean and free of any foam and detergent residue. This usually takes 15-60 minutes. The operator can sample with a clean flask, shake it well, and monitor the residue of detergent and foam in the rinse water at the discharge outlet. The removal of the lotion can be carried out by testing the conductance. If the conductance of the flushing water to the discharge water is within 10-20% of the conductance of the water supply, the flushing can be considered to be near the end point. The pH meter can also be used to determine whether the pH value of the flushing water is close to that of the discharge water.




(7) After the low-pressure flushing, the RO unit can start running again, but the initial product water should be discharged and monitored until the RO water production can meet the process requirements (conductance, pH value, etc.). This recovery time can sometimes range from a few hours to a few days to obtain stable RO produced water quality, especially after a high pH wash.



Label:
亚洲一区avxxx| 卡通 动漫 亚洲| 偷拍另类欧美日韩| 人人综合一区二区| 超碰国产天天操av| 97超碰在线久草| 国产福利免费91AⅤ视频| 午夜无码资源| 东京热正在播放| 亚洲国产精品不卡| 亚洲视频一二最新在线无码| 青草社区视频色欲。com| 香蕉成人精品导航| 一区二区不卡日韩| 红桃视频一区二区| 国产视频一二三在线观看| 国产AV无吗网站| 中文字幕乱码人妻| 亚五月天综合色导航| 欧美动一区二区在线| 九九无码专区一区二区伦理| 欧美在线观看不卡污污一区| 免费AV片国产亚洲精品乱码久久| 成人日韩av一区| 亚洲成人电影中文字母不卡| 日人人av图片专区| 亚洲毛片不卡视频| 欧美日韩最新精品一二区热热| 九一嫩草在线观看| av亚洲天堂电影| 欧美性爱网址下载| 草白浆在线小视频| 免费一区在线免费| 大香伊蕉在人线自拍| 亚洲无码区一区二| 亚洲精品国产无码| 亚洲日本美女综合| 啊啊啊啊蜜臀AV| 久草99在线观看| 亚瑟无码视频看看| 超碰人人摸人人操|